Basic Installation Method Putting Green

Fill in 4 inches with a crushed rock base, compacted to 90%-95% compaction, leaving 1 inch before reaching the height of the concrete edge. Lay 1/4 inch of decomposed granite on top of the crushed rock base and make sure to compact this evenly.